Comparison of BI Standard Reporting features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Pixel Perfect reports | 8.5120 Ratings | 00 Ratings |
|---|
| Customizable dashboards | 10.0140 Ratings | 00 Ratings |
|---|
| Report Formatting Templates | 8.0128 Ratings | 00 Ratings |
|---|
|
Comparison of Ad-hoc Reporting features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Drill-down analysis | 7.0139 Ratings | 00 Ratings |
|---|
| Formatting capabilities | 9.0138 Ratings | 00 Ratings |
|---|
| Integration with R or other statistical packages | 8.0103 Ratings | 00 Ratings |
|---|
| Report sharing and collaboration | 9.0135 Ratings | 00 Ratings |
|---|
|
Comparison of Report Output and Scheduling features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Publish to Web | 8.0129 Ratings | 00 Ratings |
|---|
| Publish to PDF | 9.0122 Ratings | 00 Ratings |
|---|
| Report Versioning | 9.0102 Ratings | 00 Ratings |
|---|
| Report Delivery Scheduling | 8.0104 Ratings | 00 Ratings |
|---|
| Delivery to Remote Servers | 9.074 Ratings | 00 Ratings |
|---|
|
Comparison of Data Discovery and Visualization features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Pre-built visualization formats (heatmaps, scatter plots etc.) | 9.0131 Ratings | 00 Ratings |
|---|
| Location Analytics / Geographic Visualization | 8.0122 Ratings | 00 Ratings |
|---|
| Predictive Analytics | 9.0102 Ratings | 00 Ratings |
|---|
| Pattern Recognition and Data Mining | 9.01 Ratings | 00 Ratings |
|---|
|
Comparison of Access Control and Security features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Multi-User Support (named login) | 9.0121 Ratings | 00 Ratings |
|---|
| Role-Based Security Model | 9.0102 Ratings | 00 Ratings |
|---|
| Multiple Access Permission Levels (Create, Read, Delete) | 10.0111 Ratings | 00 Ratings |
|---|
| Report-Level Access Control | 7.01 Ratings | 00 Ratings |
|---|
| Single Sign-On (SSO) | 8.394 Ratings | 00 Ratings |
|---|
|
Comparison of Mobile Capabilities features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| Responsive Design for Web Access | 8.0111 Ratings | 00 Ratings |
|---|
| Mobile Application | 7.793 Ratings | 00 Ratings |
|---|
| Dashboard / Report / Visualization Interactivity on Mobile | 7.7112 Ratings | 00 Ratings |
|---|
|
Comparison of Application Program Interfaces (APIs) / Embedding features of Microsoft Power BI and Primavera Unifier| Feature | | |
|---|
| REST API | 8.072 Ratings | 00 Ratings |
|---|
| Javascript API | 9.956 Ratings | 00 Ratings |
|---|
| iFrames | 8.055 Ratings | 00 Ratings |
|---|
| Java API | 8.046 Ratings | 00 Ratings |
|---|
| Themeable User Interface (UI) | 8.163 Ratings | 00 Ratings |
|---|
| Customizable Platform (Open Source) | 8.444 Ratings | 00 Ratings |
|---|
|