ECI MarkSystems vs. Oracle Primavera Portfolio Management

Overview
ProductRatingMost Used ByProduct SummaryStarting Price
ECI MarkSystems
Score 9.8 out of 10
N/A
An end-to-end residential construction management software that links all platforms from prospect to warranty and offers a unified view of projects. It is designed and constructed for production and semi-custom home builders to manage all phases of new residential construction from prospecting to warranty.N/A
Oracle Primavera
Score 7.7 out of 10
N/A
Oracle’s Primavera is a software suite designed for construction and other asset-intensive industries. It contains a variety of project planning, management, and execution components for buyers to select from.N/A
Pricing
ECI MarkSystemsOracle Primavera Portfolio Management
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
ECI MarkSystemsOracle Primavera
Free Trial
NoNo
Free/Freemium Version
NoNo
Premium Consulting/Integration Services
NoNo
Entry-level Setup FeeNo setup feeNo setup fee
Additional Details
More Pricing Information
Community Pulse
ECI MarkSystemsOracle Primavera Portfolio Management
Considered Both Products
ECI MarkSystems
Chose ECI MarkSystems
I haven't used any other tools, but I can say that ECI BuildTools has been great for our organization.
Oracle Primavera
Chose Oracle Primavera
Oracle Primavera is more easy and integrated with other systems
Chose Oracle Primavera
Oracle is better laid out and has more functionality as well as end-user flow. The login process, billing, and construction management features are easy to find, easy to use, and helpful. The limitations on Quickbooks restrict users from the ability to view and bill full …
Chose Oracle Primavera
We use Oracle ERP and are happy with it. We have long-standing relationship with Oracle and our workforce is well versed with it. We wanted a high-end scalable software for construction projects and Primavera fits the bill. Payment systems like Textura can be easily integrated …
Chose Oracle Primavera
Oracle Primavera is better and faster than the other solutions available. Especially with large data sets.
Chose Oracle Primavera
I have also used Microsoft Project in the past to do scheduling. While easier to use than Primavera, it does not have the same capabilities to determine CPM. Furthermore, it would not be appropriate for larger sized projects.
Chose Oracle Primavera
I did not select Oracle Primavera Portfolio Management. It was an inherent application. Having used other applications, compared to those, Oracle Primavera Portfolio Management is a far superior tool for portfolio management. However, in the span of the last 10 years, there …
Chose Oracle Primavera
When compared to the likes of the field, Oracle is the least friendly in regards to being accessible to the team with Smartsheet working the most favorably in that aspect. Otherwise, Oracle's PM program is more intuitive than Microsoft Project, has more features when compared …
Chose Oracle Primavera
I found Oracle Primavera better compared to Clarity as it offers better navigation. The reporting feature is also better in Primavera. The views provided by Primavera are far better compared to Clarity.
Chose Oracle Primavera
Primavera allows several users to work in a single file at the same time. This allows the team to develop and update the project schedule for reporting much faster. Also, the user can see updates that effect logically link activities in the future easily. MS Project does not.
Chose Oracle Primavera
P6 is the most robust scheduling software I've used. It's the best solution for large-scale projects.
Features
ECI MarkSystemsOracle Primavera Portfolio Management
Reporting & Analytics
Comparison of Reporting & Analytics features of Product A and Product B
ECI MarkSystems
8.5
Ratings
11% above category average
Oracle Primavera Portfolio Management
-
Ratings
Dashboards7.00 Ratings00 Ratings
Standard reports8.00 Ratings00 Ratings
Custom reports9.00 Ratings00 Ratings
Data exportability10.00 Ratings00 Ratings
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Product A and Product B
ECI MarkSystems
9.6
Ratings
24% above category average
Oracle Primavera Portfolio Management
-
Ratings
Document sharing10.00 Ratings00 Ratings
Collaboration & approvals9.00 Ratings00 Ratings
As-built drawings10.00 Ratings00 Ratings
Mobile app10.00 Ratings00 Ratings
Submittal design and management10.00 Ratings00 Ratings
Checklists8.00 Ratings00 Ratings
Specifications10.00 Ratings00 Ratings
Change orders10.00 Ratings00 Ratings
Estimating
Comparison of Estimating features of Product A and Product B
ECI MarkSystems
10.0
Ratings
22% above category average
Oracle Primavera Portfolio Management
-
Ratings
Job costing10.00 Ratings00 Ratings
Cost databases10.00 Ratings00 Ratings
Cost calculator10.00 Ratings00 Ratings
Bid creation10.00 Ratings00 Ratings
Best Alternatives
ECI MarkSystemsOracle Primavera Portfolio Management
Small Businesses
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
monday.com
monday.com
Score 8.6 out of 10
Medium-sized Companies
InEight
InEight
Score 8.3 out of 10
Planview PPM Pro
Planview PPM Pro
Score 8.9 out of 10
Enterprises
InEight
InEight
Score 8.3 out of 10
Planview PPM Pro
Planview PPM Pro
Score 8.9 out of 10
All AlternativesView all alternativesView all alternatives
User Ratings
ECI MarkSystemsOracle Primavera Portfolio Management
Likelihood to Recommend
10.0
(0 ratings)
8.0
(0 ratings)
Usability
8.0
(0 ratings)
8.0
(0 ratings)
User Testimonials
ECI MarkSystemsOracle Primavera Portfolio Management
Likelihood to Recommend
Out of all the software I have been exposed to, ECI MarkSystems really is the most user friendly for not only the builder but for trade partners as well.
Read full review
This program is well suited for online database management for construction-related fields and their contract management. It has many features which allow for reporting, issuance of changes, applications for payment and HB, and related construction-related documentation for both client and user. It also allows one to print and review in PDF any required documentation needed as per contracts.
Read full review
Pros
  • ECI MarkSystems
  • ITK
  • Insearch
Read full review
  • Critical Path Methodology will identify potential issues in on time completion if activities move.
  • A resources loaded schedule can accurately forecast % complete and staffing requirements.
  • Coding allows easy group, sort, and filtering when reporting to certain business units out of the same file.
Read full review
Cons
No answers on this topic
  • The software is high end with rich features, hence its rich price.
  • There is room for improvement in their customer service.
  • Oracle is doing its best in coming up with new features, and has a planned roadmap. It would be good if the enhancements are delivered faster.
Read full review
Usability
For our particular organization, we are semi-custom, which can make things a little more complex but we have almost always been able to find a solution due to its flexibility.
Read full review
Is easy to use but the the interface should be more nice and contemporary
Read full review
Alternatives Considered
I haven't used any other tools, but I can say that ECI BuildTools has been great for our organization.
Read full review
I did not select Oracle Primavera Portfolio Management. It was an inherent application. Having used other applications, compared to those, Oracle Primavera Portfolio Management is a far superior tool for portfolio management. However, in the span of the last 10 years, there are newer, perhaps better products available. Oracle Primavera Portfolio Management does still manage to get the job done, but its time in the sun is fading.
Read full review
Return on Investment
  • Setting up the system as intended over the last few years has make workload much better, VPOs have been significantly reduced, etc.
  • We have greatly reduced the amount of options, but implementing replacement options.
Read full review
  • P6 has had measurable ROI in the fact that projects can be completed on schedule or sooner using it.
  • P6 it presents data date stamps, which are used to share with clients during the project for the progress of the schedule.
  • P6 may have a high level of entry to use for the smaller project, which can be a hindrance to use.
Read full review
ScreenShots