Oracle Primavera Portfolio Management vs. Trimble ProjectSight

Overview
ProductRatingMost Used ByProduct SummaryStarting Price
Oracle Primavera
Score 7.7 out of 10
N/A
Oracle’s Primavera is a software suite designed for construction and other asset-intensive industries. It contains a variety of project planning, management, and execution components for buyers to select from.N/A
Trimble ProjectSight
Score 9.6 out of 10
N/A
Trimble ProjectSight, replacing the former Prolog, is a construction project management software solution for contractors and other AEC firms, providing a complete system of record for managing project information, from the field to the back office. Designed by construction professionals for construction professionals, ProjectSight is built for project managers accountable for construction costs, scope and schedules, and for project teams responsible for the successful delivery of projects.…N/A
Pricing
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Editions & Modules
No answers on this topic
No answers on this topic
Offerings
Pricing Offerings
Oracle PrimaveraTrimble ProjectSight
Free Trial
NoNo
Free/Freemium Version
NoNo
Premium Consulting/Integration Services
NoNo
Entry-level Setup FeeNo setup feeNo setup fee
Additional Details
More Pricing Information
Community Pulse
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Considered Both Products
Oracle Primavera
Chose Oracle Primavera
Oracle Primavera is more easy and integrated with other systems
Chose Oracle Primavera
Oracle is better laid out and has more functionality as well as end-user flow. The login process, billing, and construction management features are easy to find, easy to use, and helpful. The limitations on Quickbooks restrict users from the ability to view and bill full …
Chose Oracle Primavera
We use Oracle ERP and are happy with it. We have long-standing relationship with Oracle and our workforce is well versed with it. We wanted a high-end scalable software for construction projects and Primavera fits the bill. Payment systems like Textura can be easily integrated …
Chose Oracle Primavera
Oracle Primavera is better and faster than the other solutions available. Especially with large data sets.
Chose Oracle Primavera
I have also used Microsoft Project in the past to do scheduling. While easier to use than Primavera, it does not have the same capabilities to determine CPM. Furthermore, it would not be appropriate for larger sized projects.
Chose Oracle Primavera
I did not select Oracle Primavera Portfolio Management. It was an inherent application. Having used other applications, compared to those, Oracle Primavera Portfolio Management is a far superior tool for portfolio management. However, in the span of the last 10 years, there …
Chose Oracle Primavera
When compared to the likes of the field, Oracle is the least friendly in regards to being accessible to the team with Smartsheet working the most favorably in that aspect. Otherwise, Oracle's PM program is more intuitive than Microsoft Project, has more features when compared …
Chose Oracle Primavera
I found Oracle Primavera better compared to Clarity as it offers better navigation. The reporting feature is also better in Primavera. The views provided by Primavera are far better compared to Clarity.
Chose Oracle Primavera
Primavera allows several users to work in a single file at the same time. This allows the team to develop and update the project schedule for reporting much faster. Also, the user can see updates that effect logically link activities in the future easily. MS Project does not.
Chose Oracle Primavera
P6 is the most robust scheduling software I've used. It's the best solution for large-scale projects.
Trimble ProjectSight
Chose Trimble ProjectSight
I have only used procore otherwise, and from what I remember Procore does not have as many features in terms of keeping track of CD documents, and organizing RFI's like Trimble does. I think overall Trimble ProjectSight (Prolog) is a better product, and if it was up to me I …
Chose Trimble ProjectSight
Trimble ProjectSight (Prolog) is very well suited for general contractors and large projects. Procore is better suited to individual specification use.
Chose Trimble ProjectSight
procore is what I currently use. It is good, they are both efficient and very good products. They both have their flaws, but they do what they are there to do and in a smart manner. Great way to effectively distribute and have all information readily available in your hand at …
Features
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Reporting & Analytics
Comparison of Reporting & Analytics features of Product A and Product B
Oracle Primavera Portfolio Management
-
Ratings
Trimble ProjectSight
10.0
Ratings
27% above category average
Dashboards00 Ratings10.00 Ratings
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Product A and Product B
Oracle Primavera Portfolio Management
-
Ratings
Trimble ProjectSight
5.0
Ratings
41% below category average
Plan distribution & viewing00 Ratings6.10 Ratings
Plan markups & sharing00 Ratings6.10 Ratings
Issue tracking & punchlists00 Ratings6.10 Ratings
Photo documentation00 Ratings6.10 Ratings
Jobsite reports00 Ratings4.00 Ratings
Document sharing00 Ratings3.00 Ratings
RFI tools00 Ratings5.60 Ratings
Collaboration & approvals00 Ratings2.00 Ratings
As-built drawings00 Ratings6.00 Ratings
Mobile app00 Ratings4.00 Ratings
Submittal design and management00 Ratings6.10 Ratings
Checklists00 Ratings9.00 Ratings
Change orders00 Ratings1.00 Ratings
Estimating
Comparison of Estimating features of Product A and Product B
Oracle Primavera Portfolio Management
-
Ratings
Trimble ProjectSight
2.0
Ratings
120% below category average
Cost databases00 Ratings2.00 Ratings
Cost calculator00 Ratings2.00 Ratings
Best Alternatives
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Small Businesses
monday.com
monday.com
Score 8.6 out of 10
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
Medium-sized Companies
Planview PPM Pro
Planview PPM Pro
Score 8.9 out of 10
InEight
InEight
Score 8.3 out of 10
Enterprises
Planview PPM Pro
Planview PPM Pro
Score 8.9 out of 10
InEight
InEight
Score 8.3 out of 10
All AlternativesView all alternativesView all alternatives
User Ratings
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Likelihood to Recommend
8.0
(0 ratings)
5.5
(0 ratings)
Usability
8.0
(0 ratings)
-
(0 ratings)
User Testimonials
Oracle Primavera Portfolio ManagementTrimble ProjectSight
Likelihood to Recommend
This program is well suited for online database management for construction-related fields and their contract management. It has many features which allow for reporting, issuance of changes, applications for payment and HB, and related construction-related documentation for both client and user. It also allows one to print and review in PDF any required documentation needed as per contracts.
Read full review
  • Well suited: distributing information and collecting and keeping data
  • Less suited: quickly trying to process something or get info to subs
Read full review
Pros
  • Critical Path Methodology will identify potential issues in on time completion if activities move.
  • A resources loaded schedule can accurately forecast % complete and staffing requirements.
  • Coding allows easy group, sort, and filtering when reporting to certain business units out of the same file.
Read full review
  • Keeps log of most recent CD documents
  • Allows marking up of PDFs
  • Notifies you if you have an outstanding item
Read full review
Cons
  • The software is high end with rich features, hence its rich price.
  • There is room for improvement in their customer service.
  • Oracle is doing its best in coming up with new features, and has a planned roadmap. It would be good if the enhancements are delivered faster.
Read full review
  • A lot of steps, tad confusing
  • Very in-depth, not necessarily a con, but requires a lot of information
Read full review
Usability
Is easy to use but the the interface should be more nice and contemporary
Read full review
No answers on this topic
Alternatives Considered
I did not select Oracle Primavera Portfolio Management. It was an inherent application. Having used other applications, compared to those, Oracle Primavera Portfolio Management is a far superior tool for portfolio management. However, in the span of the last 10 years, there are newer, perhaps better products available. Oracle Primavera Portfolio Management does still manage to get the job done, but its time in the sun is fading.
Read full review
I have only used Procore otherwise, and from what I remember Procore does not have as many features in terms of keeping track of CD documents, and organizing RFI's like Trimble does. I think overall Trimble ProjectSight (Prolog) is a better product, and if it was up to me I would pick Trimble ProjectSight (Prolog) over Procore.
Read full review
Return on Investment
  • P6 has had measurable ROI in the fact that projects can be completed on schedule or sooner using it.
  • P6 it presents data date stamps, which are used to share with clients during the project for the progress of the schedule.
  • P6 may have a high level of entry to use for the smaller project, which can be a hindrance to use.
Read full review
  • did not purchase at this time. Looking for something better suited to our needs
Read full review
ScreenShots